• Transmission

    230 kV GIS Upgrade and Rehabilitation

    Upgrade and rehabilitation work for a seven-bay 230 kV gas-insulated switchgear installation.

    • 230 kV
    • Seven-bay GIS
    • Upgrade & rehabilitation
  • Renewable generation

    Solar Project GIS Erection and Commissioning

    Erection, testing, and commissioning of 230 kV gas-insulated switchgear for a 500 MW solar project.

    • 500 MW solar
    • 230 kV GIS
    • Erection, testing & commissioning
  • Power generation

    GSU and UAT Transformer Assembly and Commissioning

    Assembly, testing, and commissioning of three 522 MVA generator step-up transformers and three 45 MVA unit auxiliary transformers.

    • 1,800 MW plant
    • 3 × 522 MVA
    • 3 × 45 MVA
    • 500 kV
  • Power generation

    500 kV GIS and XLPE Cable AC Withstand Testing

    AC withstand testing of a ten-bay 500 kV GIS installation and its 500 kV XLPE cables.

    • 500 kV
    • Ten-bay GIS
    • XLPE cables
    • AC withstand
  • Transmission

    150 MVA Power Transformer Relocation

    Relocation of two 150 MVA, 230/138 kV power transformers.

    • 2 × 150 MVA
    • 230/138 kV
    • Transformer relocation
  • Power generation

    Generator Circuit Breaker Retrofit

    Retrofit work on a generator circuit breaker at a power generation facility.

    • Generator circuit breaker
    • Retrofit
  • Power generation

    500 kV GSU Transformer Overhaul

    Overhaul, leak repair, maintenance, and testing of a 522 MVA, 500 kV generator step-up transformer.

    • 522 MVA
    • 500 kV GSU
    • Overhaul & leak repair
  • Transmission

    500 kV Switchyard Maintenance and Testing

    Maintenance and electrical testing of 500 kV switchyard equipment.

    • 500 kV switchyard
    • Maintenance & testing

Do you have an upcoming Electrical Project?

Let us discuss your requirements and schedule your appointment with our team.

Talk to an Expert